Project Description

Poplar Street Bridge Ramp to I-55

TWM provided value engineering services to eliminate ground improvements on the Poplar Street Bridge Ramp by designing an additional span. Working with the contractor, TWM prepared preliminary bridge plans for V.E. approval: prepared final bridge, MSE wall, and roadway plans for the new span; revised 30 sheets of the original bridge plans to accommodate the new span; and coordinated with MoDOT and MSD. The new span had a curved deck on straight girders. The ramp was constructed during a short road closure.

  • Superstructure: 1-span (55′) curved deck on straight 54″ P/S Concrete I-Girders
  • Substructure: Multi-column drilled shaftsupported end bent with MSE wall and multi-column hammer head type intermediate bent supported on drilled shafts

Visit Roadway Bridges.

  • LOCATION: St. Louis, MO

  • CLIENT: MoDOT

  • VALUE ENGINEERING SAVINGS: $75,900 

Exceptional Service. Nothing Less.

TO OUR VALUED CLIENTS

TWM continues the important business of supporting our nation’s essential infrastructure in these uncertain times. We are committed to our mission of providing Exceptional Service, Nothing Less to you, our clients and partners. As a professional services firm, the health of our employee-owners and their families is paramount. We are following government directives and public health guidance, implementing work-from-home and other social distancing and hand hygiene practices. We have employed additional technological resources to support our modified operating structure, and we expect to be able to do so with minimal disruption. If you need to visit our offices in person or have trouble reaching your TWM contact, please contact us at 618.624.4488 so we can make arrangements or put you in touch with the appropriate person. Thank you for placing your trust in TWM. Wishing you safety and good health.