IL-159 Pavement Microsurfacing2018-06-07T17:51:04+00:00

Project Description

IL-159 Pavement Microsurfacing

Pavement Management and Pavement Engineering Services for IL-159 Microsurfacing - Roadway Design - TWM, Inc.
  • LOCATION: Edwardsville and Glen Carbon, IL

  • CLIENT: Illinois Department of Transportation, District 8

  • CONSTRUCTION COST: $608,000

Pavement engineering services were provided by TWM to complete this project. Phase II entailed in-house design engineering for the microsurfacing of IL 159 from Troy Road to Magnolia Street in Edwardsville and Glen Carbon.  The 1.92-mile section of roadway was showing signs of deterioration through transverse cracks and areas of pavement failure.  Improvements included pavement patching, crack sealing, and a single-pass microsurfacing.  Pavement markings and detector loops for signals were re-established. TWM also developed a Work Zone Transportation Management Plan since IL 159 is a significant route.  Due to high peak hour traffic counts and only two-lane, two-way traffic, nighttime work was implemented.

Visit Transportation.

Exceptional Service. Nothing Less.