Project Description

Shipman, IL Bridge 238.47 Springfield Subdivision

Shipman, IL Bridge 238.47 - Springfield Subdivision
  • LOCATION: Shipman, IL

  • VALUE ENGINEERING SAVINGS: $200,000 

TWM’s value engineering structural redesign preserved the existing retaining walls via the addition of new wingwalls.  The original contract plans called for building expensive new retaining walls on drilled shafts and eliminated the existing retaining walls.  New wing extensions resulted in approximately $200,000 savings and reduced construction time.