Railway Loadout Designs for Grain Facility2018-07-03T15:10:54+00:00

Project Description

Railway Loadout Designs for Grain Facility

ADM Truck and Rail Loadout Upgrades
  • LOCATION: Gilman, IL

  • CLIENT: Midwest Grain Facility

Railway engineering services and loadout designs were performed by TWM for this project for a Midwest grain company. Our topographic survey verified existing conditions so we could propose dimensions for construction of a new  60,000 bushel per hour bulk weigher and loadout system. TWM verified the location of existing column lines, centerline of the railroad, existing workhouse structure, discharge flange of south upper garner, and various floor elevations within the work-house structure.  Based on  field measurements TWM marked cutout areas on the existing floors and walls within the structure for proposed spouting locations and marked beam connection points on the wall of the workhouse structure at proposed elevations.

Go to Industry.

Exceptional Service. Nothing Less.

TO OUR VALUED CLIENTS

TWM continues the important business of supporting our nation’s essential infrastructure in these uncertain times. We are committed to our mission of providing Exceptional Service, Nothing Less to you, our clients and partners. As a professional services firm, the health of our employee-owners and their families is paramount. We are following government directives and public health guidance, implementing work-from-home and other social distancing and hand hygiene practices. We have employed additional technological resources to support our modified operating structure, and we expect to be able to do so with minimal disruption. If you need to visit our offices in person or have trouble reaching your TWM contact, please contact us at 618.624.4488 so we can make arrangements or put you in touch with the appropriate person. Thank you for placing your trust in TWM. Wishing you safety and good health.