Project Description

Tri-Level Interchange – New I-70 Over I-55 and I-64

As part of the new bridge project over the Mississippi River at St. Louis, Interstates 55, 64, & 70 will now be split so that I-70 is diverted along a new alignment to pass over the new bridge and I-55 / I-64 will continue over the existing Poplar Street Bridge. TWM’s structural engineering staff prepared the curved girder erection plans for two of the structures on this project.These were 3-span structures ranging from 457’ to 487’ long with 7’ tall steel plate girders.TWM also designed temporary soil retention systems at several of the substructures and checked cantilever forming brackets.

Visit our Roadway Bridge page.

  • LOCATION: East St. Louis 

  • OWNER: IDOT 