Poplar Street Roadway Reconstruction2018-06-07T17:39:14+00:00

Project Description

Poplar Street Roadway Reconstruction

  • LOCATION: Mascoutah, IL

  • CLIENT: City of Mascoutah, IL

  • CONSTRUCTION COST: $418,686

Road engineering design services were provided by TWM using 100% local funds. The City of Mascoutah hired TWM to design the reconstruction of 0.3 miles of Poplar, from 6th Street to 10th Street.  The existing high-crown oil and chip roadway was replaced with new HMA pavement, V-gutter, and a 5’ sidewalk along one side. Drainage was particularly difficult due to extremely flat terrain, and shallow drainage outlet points, which TWM addressed through a combination of open ditches, swales and enclosed storm sewers. Other responsibilities included coordination of utilities; public meetings; preparation of plans, specifications, and cost estimates; and preparation of land negotiation documents.

Visit Roadway Design.

Exceptional Service. Nothing Less.

TO OUR VALUED CLIENTS

TWM continues the important business of supporting our nation’s essential infrastructure in these uncertain times. We are committed to our mission of providing Exceptional Service, Nothing Less to you, our clients and partners. As a professional services firm, the health of our employee-owners and their families is paramount. We are following government directives and public health guidance, implementing work-from-home and other social distancing and hand hygiene practices. We have employed additional technological resources to support our modified operating structure, and we expect to be able to do so with minimal disruption. If you need to visit our offices in person or have trouble reaching your TWM contact, please contact us at 618.624.4488 so we can make arrangements or put you in touch with the appropriate person. Thank you for placing your trust in TWM. Wishing you safety and good health.