Fayetteville Sanitary Sewer Rehabilitation2018-06-14T16:09:14+00:00

Project Description

Fayetteville Sanitary Sewer Rehabilitation

TWM performed a comprehensive video inspection of the Village’s entire wastewater collection system, determining infiltration issue locations causing washout problems at the wastewater treatment facility during heavy precipitation events. TWM used this data to develop a Village-wide rehabilitation plan.  To reduce installation time and the cost of traditional dig-and-replace methods, TWM proposed trenchless sewer rehabilitation techniques for these ongoing projects. Project responsibilities include grant preparation and administration, preparation of plans and specs, and construction phase services.  Projects have been funded by the U.S. Department of Housing and Urban Development (HUD) through the CDBG program administered by St. Clair County IGD.

Return to our Infrastructure page.

  • LOCATION: Village of Fayetteville, IL

  • CLIENT: Village of Fayetteville, IL

Exceptional Service. Nothing Less.