Coeur De Ville Drive Reconstruction2018-06-06T20:41:59+00:00

Project Description

Coeur De Ville Drive Reconstruction

TWM Tackles Coeur De Ville Drive
  • LOCATION: Creve Coeur, MO

  • CLIENT: MoDOT / City of Creve Coeur, MO

  • CONSTRUCTION COST: $592,562

Top transportation engineering firm, TWM, provided engineering and surveying services for this 6,000’ project running from Ladue Road to Olive Blvd on Coeur De Ville Drive.  The main focus of this project addressed issues pertaining to failing pavement, deteriorating curb and gutter, differential sidewalk settlement, addition of pedestrian beacons, and non-compliant curb ramps, bringing them into compliance with current ADA Guidelines and PROWAG rules.  Required significant coordination with MoDOT due to STP funding and MoDOT right-of-way.  In addition to PS&E, TWM provided topographic survey and identified existing right-of-way.

Return to Roadway Design.

Exceptional Service. Nothing Less.

TO OUR VALUED CLIENTS

TWM continues the important business of supporting our nation’s essential infrastructure in these uncertain times. We are committed to our mission of providing Exceptional Service, Nothing Less to you, our clients and partners. As a professional services firm, the health of our employee-owners and their families is paramount. We are following government directives and public health guidance, implementing work-from-home and other social distancing and hand hygiene practices. We have employed additional technological resources to support our modified operating structure, and we expect to be able to do so with minimal disruption. If you need to visit our offices in person or have trouble reaching your TWM contact, please contact us at 618.624.4488 so we can make arrangements or put you in touch with the appropriate person. Thank you for placing your trust in TWM. Wishing you safety and good health.