Belleville CSO Lift Station2018-08-01T16:03:21+00:00

Project Description

Belleville CSO Lift Station

  • LOCATION: Belleville, IL

  • CLIENT: City of Belleville

TWM performed wastewater lift station engineering design services for the expansion and upgrade of Belleville’s Water Reclamation Facility. Our scope included a new terminal lift station and force main.  The 24” DIP force main included ceramic epoxy lining to provide protection from hydrogen sulfide.

The project also included design of a 200 MGD lift station for combined flows. The combined sewage is pumped through two 60” fiberglass cement force mains and 24” DIP force main to a holding basin.  As part of the project, a pipe bridge was used for the pipes crossing over Richland Creek.  The force mains were designed to ensure they could drain back to the wet well after pump shut off.  Pipe bridge design included coordination with DNR/COE regarding impacts to the floodway.

Visit Water Infrastructure.

Exceptional Service. Nothing Less.

TO OUR VALUED CLIENTS

TWM continues the important business of supporting our nation’s essential infrastructure in these uncertain times. We are committed to our mission of providing Exceptional Service, Nothing Less to you, our clients and partners. As a professional services firm, the health of our employee-owners and their families is paramount. We are following government directives and public health guidance, implementing work-from-home and other social distancing and hand hygiene practices. We have employed additional technological resources to support our modified operating structure, and we expect to be able to do so with minimal disruption. If you need to visit our offices in person or have trouble reaching your TWM contact, please contact us at 618.624.4488 so we can make arrangements or put you in touch with the appropriate person. Thank you for placing your trust in TWM. Wishing you safety and good health.