FEATURED PROJECT:
  Caseyville Township Wastewater   Treatment Plant Expansion

TWM designed the expansion of the existing Caseyville Township Wastewater Treatment Facility from 2.2 MGD to 4.4 MGD.  The existing plant is an extended aeration facility and will remain so.  The aeration system for the existing plant will be replaced and the sludge facilities abandoned and reconstructed.  The existing headworks of the plant will also be abandoned and a new terminal lift station and bar screen will be built. The expansion uses the Sequencing Batch Reactor technology, cloth media filtration, and ultraviolet light disinfection.

OTHER WASTEWATER PROJECTS

  • Belleville Wastewater Treatment Plant Upgrade and     Combined Sewer Overflow Remediation
        Belleville, IL


  • Monroe County Electrical Co-op Facility Planning Area     New Wastewater Treatment Facility and Collection     System
        Monroe County, IL


  • Stookey Township Wastewater Treatment Plant     Improvements
        Belleville, IL


  • Swansea Wastewater Treatment Plant Expansion
        Swansea, IL


  • Mascoutah Sanitary Collection System Model
        Mascoutah, IL


  • Millstadt Wastewater Treatment Plant Expansion
        Millstadt, IL


  • St. Jacob Facility Planning Area Expansion
        St. Jacob, IL
  • Return to Wastewater Services