TWM developed a pavement maintenance and management program for 37 parking facilities for METRO bus/rail in the St. Louis area that met federal FTA TAMP guidelines.

Scope of Work

  • Created an inventory of each facility (pavement, sidewalk, curbs, striping, drainage, etc.)

  • Evaluated components

  • Determined the ratings of each component

  • Developed a written report that discussed the evaluation process, results, and future maintenance options

Client

Bi-State Development Agency

Location

St. Louis, MO

Benefits

  • Various pavement surface treatments were evaluated for cost and longevity
  • Various types of pavement were inspected to determine rating and condition

Categories

Pavement Management
Transportation