TWM has provided on-going design and construction phase services to the St. Clair County Transit District for the extension of the MetroBikeLink Trail. Under a Master Agreement, TWM has been working with St. Clair County Transit District to design 16 miles of the MetroBikeLink Trail from Fairview Heights Station to SAFB Station. Improvements have included new designs as well as connections to existing trails throughout the difficult terrain of the active light-rail alignment, encompassing eight major beam bridges, nine retaining walls, various enclosed drainage systems and culvert designs, and five pre-engineered bridges.
TWM’s design is forming the backbone of the bike trail system in St. Clair County, linking MetroBikeLink with Swansea’s Richland Creek Bikeway and Belleville’s Richland Creek Greenway, and providing the opportunity for future expansion of trails throughout the county.
Scope of Work
Client
St. Clair County Transit District / METRO
Location
St. Clair County, IL
Benefits
- Bike trail system connects MetroBikeLink with Swansea’s Richland Creek Bikeway and Belleville’s Richland Creek Greenway
- New designs connect existing trails throughout difficult terrain of the active light-rail alignment
Categories
Construction Phase Services
Transportation
Roadways
