OUR PROJECTS
Explore some of TWM’s projects that demonstrate our design expertise, technical knowledge, and comprehensive range of capabilities.
LATEST PROJECTS
TWM has built a solid reputation over the past 80 years. Our clients trust us, and we stand behind our work. Find out more about our engineering and geospatial projects.
Engineering
Clinton Hill Conservation Park Loop Trail
TWM designed a 10’ wide shared-use path to loop around Swansea’s newest park, Clinton Hill Golf Course. The old, degraded golf cart paths were widene [...]
Rock Island Trail Extension at Pleasant Hill
The existing Rock Island Trail within Pleasant Hill, MO has a spur off the main trail alignment that routes users around the existing Union Pacific r [...]
America’s Central Port – South Harbor Terminal
This design-build project with Korte Luitjohan, Inc. included construction of an enclosed rail building with an underground rail pit/drag conveyor an [...]
U.S. Route 40 Bridge Slide
TWM provided engineering services for IDOT’s first successful bridge slide in Pocahontas, IL. A 108’ single-span superstructure was constructed on te [...]
Wayne City Pre-K Through 12 School
TWM provided the civil engineering and land surveying services to Wayne City Unified School District #100 for a new K-12 elementary school on their 1 [...]
Sylvan Springs Senior Apartments
TWM worked with the project developer on the site design for a 50-unit senior living apartment building that included on-site parking, sidewalks, wal [...]
Wastewater Treatment Plant Facility Plan
Due to high wet weather flows, operating this wastewater treatment plant had become challenging—and the state EPA required the City to address the is [...]
Wastewater Treatment Plant Facility Plan & Expansion
TWM prepared a facility plan and designed the expansion of this plant from a design capacity of 2.7 to 5.0 MGD, an increase of 85%. TWM performed flo [...]
Belleville Pavement Management System
Assessed the pavement of the streets within Belleville to provide comprehensive data on their condition. Information was combined with the City’s GIS [...]
Trenton Pavement Management System
Assessed the pavement of the streets within Trenton to provide comprehensive data on their condition. Information was combined with the City’s GIS to [...]
Mid Missouri ADA Design-Build, Owner’s Representative
MoDOT selected TWM to assist with data collection, contract writing and risk management on this large-scale ADA-compliant project that touched 60 loc [...]
MidAmerica St. Louis Airport Parking Lot
TWM worked on this design-build project with Impact Strategies to increase parking capacity for the main terminal, install a rental/employee parking [...]
IL Route 158 Streetscape
During a repaving project, IDOT eliminated the on-street parking along IL Route 158 (Washington Street). This project will reconstruct the curbing ea [...]
IL 160 & Old Highway 50 Drainage Improvements
Installation of enclosed storm sewer system along the west side of Illinois 160 from Old U.S. Highway 50 to just north of W. 4th Street. TWM conducte [...]
Utility Tunnel Inspection
Performed a CCTV video inspection of a utility tunnel/corridor under City Hall annex building of University City. Due to the limited access, client w [...]
Morgan County Levee Video Inspections
Performed CCTV video inspections of existing pipes through the earth levee’s at various locations around several levee districts. Access to the pipes [...]
Geospatial
Korean Veterans Bridge
The Music City Grand Prix was a one-of-a-kind experience centered in downtown Nashville, TN. TWM utilized mobile LiDAR technology to quickly capture [...]
USACE Puerto Rico Flood Walls
The purpose of this project was to collect high-water locations/elevations and some adjacent finished floor elevations using mobile LiDAR. As most ar [...]
Sanitary Sewer GIS & Analysis
GIS mapping was conducted on the sanitary sewer networks for the City of St. Charles. Over 8,500 manholes were depicted within this GIS. In addition, [...]
Ameren Gas Distribution Data Collection & Asset Management
Topographic survey, utility location, project coordination with subcontractors and GIS deliverable of approximately 585 miles of gas distribution mai [...]
Utility Tunnel Inspection
Performed a CCTV video inspection of a utility tunnel/corridor under City Hall annex building of University City. Due to the limited access, client w [...]
Mississippi River Bridge Approach
The I-70 Mississippi River Bridge project includes not only the river bridge, but the approaches, direct and indirect, ramps, a tri-level interchange [...]

EXCEPTIONAL SERVICE. NOTHING LESS.
That’s our company mission and our promise to you. Our success is built upon a solid reputation for getting the job done right. One thing we are particularly proud of is approximately 95% of TWM’s work comes from repeat business. We believe our resolution of challenges sets us apart, and based on our level of repeat business, we think our clients will agree.




















