Project Description
Scott Air Force Base Water Main Replacement

LOCATION: Scott Air Force Base
CLIENT: American Water Military Services Group
As part of a design-build team, TWM provided land surveying, civil engineering, and construction observation services for the replacement of water mains base-wide. The firm’s responsibilities included design of 68,000 linear feet of 12”, 10”, and 8” water main, research of existing utilities, preparation of plans and specifications, and preparation of construction permits and NPDES storm water permits. It was essential to minimize service interruptions, so directional boring was used during construction to reduce impacts to roadways and other sensitive areas. TWM subsequently provided GIS mapping for the entire water system, including details of the service connections to each building.