The St. Louis District of the U.S. Army Corps of Engineers will be designing and constructing a new 1,200’ pile-founded lock in the auxiliary miter gate bay, a 1,200’ upstream approach wall, and a 650’ downstream approach wall to replace the existing 600’ long guidewall. This project will also include relocation and site-specific environmental mitigation work. In order to complete the design and construction, TWM performed a comprehensive topographic survey of the entire site. This includes aerial LiDAR and photogrammetry, mobile and terrestrial LiDAR, and hydrographic surveying as well as conventional surveying techniques.
Scope of Work
Client
USACE St. Louis District
Location
Winfield, MO
Benefits
- Survey work helped complete the design and construction
- Techniques assisted in site-specific environmental mitigation work